Azizi Developments is one of Dubai’s leading private developers known for its luxurious residential and commercial projects developed over the years. The developer recently announced their latest marvel Aura is ready to be launched in the 2nd quarter of 2020.

Aura is located in Jebel Ali, Middle East’s largest marine port, near UAE Exchange Metro Location. Jebel Ali has only a few freehold residential projects with Aura being one of them. The 479 residential-unit development is 18 floors tall. These units are unfurnished and vary in size. However, they are laced with the finest bathroom fittings and appliances.

Out of these 479 apartments, there are 87 single-bedroom units, 349 studios, and 43 two-bedroom units. The developer has paid complete attention to the look and architect of each unit as they have impeccable designs and finishing, keeping in view the contemporary aspect. Moreover, every apartment is well-lit and spacious. This project also offers numerous facilities for residents in the form of a fully-equipped gym, café, health club, and spa, etc. It truly promises a modern lifestyle that every homeowner craves for. There’s also an upscale retail space spanning over an area of 9,000 square feet.

According to the statement given by the developer, the project is 85% complete. They have joined hands with top professional contractors and consultants to accelerate the production work so that the project can be completed by the next quarter. Executive Engineering director Mohamed Ragheb believes that Aura has maintained high levels of efficiency while no compromise was made on the precautionary measures keeping in view the current global situation.

People who are looking for properties in UAE, this one is an ideal project for them to buy a home or retail space in as it boasts of all the latest features and amenities. The structure of the Aura is fully complete. However, a little work is left to be done in terms of internal plastering and blockwork. Similarly, the construction of the swimming pool is also underway. It is near the completion status. There is only 5% of elevator work left and at the same time, MEP (mechanical, electrical, and plumbing work) currently stays at 93% completion level. Tiling and façade work is 90% complete while 86% work of HVAC is done. Lastly, 82% of finishing work is also complete.

Aura is not the only property that Azizi Developments is gearing to complete in 2020. They have another project that will be launched this year itself. The face-paced completion of this development has left the developers and their partners in a happy space. They are keen to meet the demands of their customers by launching more projects that offer a premium quality lifestyle in the near future.